wp-cerber
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114The Techno Pieux Meaux Team and the Techno Pieux Europe Engineering Office have recently been carrying out foundations tests in Croydon, a borough in the south of the Great London in the UK. Thanks to these tests we have been able to pinpoint the design and the installation costs for the Techno Pieux foundations to cover an outdoor tennis court. The tennis court belongs to a college where over 1000 students are registered.
The determining factors for the company proposing this job have been Techno Pieux’s screwed metal piles and the small size of Techno Pieux installation equipment since the ground on site has limited weight-bearing capacity for 8 meters in depth and the job will have to be done during the school year.
There will be further information during the execution of this project.
SCREW PILES
Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.