wp-cerber
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114Techno Metal Posts are installed underneath the structure to support the loads of your structure. They are screwed into the ground and secured to the reinforcement before the concrete is poured. During installation, the bearing capacity of each pile is known in real time. The screwed piles are installed at a depth defined by the engineering department in order to take the loads of the structure and ensure that their minimum bearing capacities are reached. This technique ensures the stability of a construction in the case where the soil has a low bearing capacity, for example.
A plate is welded on each pile and secured to the reinforcement. We offer different types of plates as standard. We can also adapt them to your needs.
Techno Metal Posts are installed underneath the structure to take up the forces of the sill. The positioning of each pile is determined by the engineering department according to the load bearing capacity. The pile will be screwed into the ground until the determined bearing capacity is obtained. The reinforcement will be attached to the support plate welded to the pile. The concrete can then be poured normally.
In the case of prefabricated stringers, the piles are placed between each stringer. The screwing torque of each pile is determined according to the forces of the sill to be supported. All calculations from the load descriptions are made by the engineering department. Each pile will be equipped with a plate welded with concrete reinforcing bars to support the sills.
Techno Metal Post's engineering department is responsible for the analysis and validation of your projects. When helical piles are specified as the foundation for a project, Techno Metal Post's engineers will determine the type of piles to be installed based on the loads to be supported and the soil characteristics. The engineer can issue a certificate of compliance and guarantee the work in accordance with current standards.
Our mechanical engineering team designs and produces specialized equipment for the installation of helical piles. This equipment allows us to determine, in real time, the required depth to ensure the stability of the project.
Our in-house engineering department studies your project and proposes the appropriate solution. The engineering team is able to issue the necessary documents to meet the requirements of your municipality.
Helical piles have very little impact on the environment, unlike concrete which leaves a large environmental footprint. With no excavation required, our helical piles are installed simply, effortlessly, and cleanly without disruption to the surrounding area.
With Techno Metal Post screw pile foundations, it’s possible to build a patio in a single day. Take a look at the following videos demonstrating how quick and easy it is to carry out a construction project using Techno Metal Post screw piles.
SCREW PILES
Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.