Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114
I am a deck installer and I want to know how this (technology) works. | Techno Metal Post
Contact a dealer
Full project address
01
Most popular
02
Categories
01
Professionals

I am a deck installer and I want to know how this (technology) works.

The pile is screwed into the ground by our certified installers using specialized proprietary hydraulic equipment, until the pile reaches the required bearing capacity. The helix supports the load. A gauge on the installation machine measures the torque, so bearing capacity is confirmed on-site during the installation of the pile, so our certified installers know the exact allowable load capacities of each pile after it has been installed.

Once installed, our pile caps are used to attach the pile to the framing system. TMP pile caps come in many sizes and varieties, depending on the framing structure.

Back to the FAQ

Other options for getting help

SCREW PILES

WITH TECHNO METAL POST, IT'S FAST AND EASY

Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.

Find an installer
crossmenuarrow-leftarrow-right