wp-cerber
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114It depends on the size of the deck project – the bigger the project, the more piles required. As well, whether the deck is attached to an existing structure, or if it is free-standing, also makes a difference. A deck attached to an existing structure requires fewer piles with a smaller diameter because the existing structure supports the lateral load. A free-standing deck requires more piles and with a larger diameter in order to support the lateral load. The number of piles /pile location is provided by the deck designer. The rule of thumb is a pile spacing of 8-10 feet between piles.
SCREW PILES
Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.