action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114The French company Sleeper Line has entrusted the foundations for several of their modular buildings to Techno Pieux Le Mans-Tours. This construction job needed to install 108 piles to support the modules and the bridges interconnecting the different buildings.
The speed with which the Techno Metal Post installation team worked was much appreciated. They only needed 5 days to put in the piles, and no excavation was necessary. This revolutionary method also allows for removal of the screwed piles without leaving any marks or causing any damage to the earth. In this case, the piles will be removed in one year when the modular buildings will be taken down.
SCREW PILES
Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.