wp-cerber
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114The Ecomaritime Park boardwalk in l’Anse du Port, Nicolet, Qc., Canada is now open. This elevated wooden boardwalk – 1km long, with a 12 m (39') high observatory at the end – was completely reconstructed. It crosses a sugar bush of silver maples and a marshland, which is home to a wide variety of fauna.
Year: January 2018
Dealer: Bois-Francs / Québec Est
Engineer in charge of the project: Rouleau – Desaulniers
Location: Ville de Nicolet
Main contractor: Lambert et Grenier
Project objectives:
Specific challenges:
Advantages:
Materials used:
Type of soil: sand and clay
Equipment used: ET1 and EM1
Torque power per pile: 1100 ft-lb to 5000 ft-lb
Engineer’s estimated requirements: 4” diameter piles in galvanized steel
Insertion depth: Approximately 9 feet
Structural details: Structure is steel/wood
SCREW PILES
Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.