Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technopieu/domains/staging.technopieux.com/wp-includes/functions.php on line 6114
520-Pile Project, Quebec | Techno Metal Post
Contact a dealer
Full project address
01
Most popular
02
Categories
01
Professionals

Techno Metal Post

520-Pile Project, Quebec

02-Immeubles
Techno Metal Post Quebec team operating specialized equipment under the supervision of Chief Engineer Pascal Marceau.

In September 2014, Techno Metal Post Quebec undertook its largest project to date, clearly demonstrating that the use of helical piles isn’t limited to housing projects. Over the last year, in fact, Techno Metal Post has registered an increase in orders coming from the commercial and industrial sectors.

No less than 522 P3 HD piles (each with a maximum load capacity of 225 kN) were required to support the 14-inch (355 mm) thick reinforced concrete foundation used to expand the Atrium Innovation building. The piles were screwed into a highly-compacted bed of gravel and sand at an average depth of 27 feet (8.5 meters).

These construction efforts caught the attention of local media. Télémag Québec documented the process in a video coverage that explains the different stages involved in a project of this magnitude. Despite the scope of the project, construction work was completed within a week and involved a mere 6 Techno Metal Post employees.

 

Back to case studies

SCREW PILES

WITH TECHNO METAL POST, IT'S FAST AND EASY

Techno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.

Find an installer
crossmenuarrow-leftarrow-right